AIR-CONDITIONING & ELECTRICAL UPGRADES

UPGRADE THE SYSTEMS
YOUR BUILDING DEPENDS ON

Commercial air-conditioning and electrical upgrade projects covering replacement, improvement work and associated alterations. SPXSA coordinates the technical trades and building-related work through one controlled project process.

Cape Town | Johannesburg | Pretoria | Durban | Selected Areas Nationwide
AIR-CON
UPGRADES
ELECTRICAL
UPGRADES
TECHNICAL
COORDINATION
CONTROLLED
INSTALLATION
PROJECT FEATURE / AIR-CONDITIONING & ELECTRICAL UPGRADES
UPGRADING AGEING BUILDING SERVICES TO IMPROVE RELIABILITY

Ageing air-conditioning and electrical infrastructure can become an operational problem long before complete failure. Repeated breakdowns, dated distribution equipment and inefficient systems create maintenance pressure and increase the risk of disruption.

WHEN BUILDING SERVICES AGE,
REPEATED REPAIRS CAN BECOME AN OPERATING COST OF THEIR OWN.

01
THE CHALLENGE

AGEING AIR-CONDITIONING AND ELECTRICAL DISTRIBUTION REQUIRED UPGRADING

The office park was experiencing repeated breakdowns associated with ageing air-conditioning equipment and electrical distribution.

High energy consumption formed part of the operational concern, while the existing electrical infrastructure also required upgrading to support the revised building-services configuration.

The project therefore combined replacement of four rooftop air-conditioning units with upgrades to distribution boards, breakers and cabling rather than treating the HVAC and electrical requirements as unrelated maintenance items.

PROJECT RECORD

ELECTRICAL DISTRIBUTION — BEFORE & AFTER

The photographs below document the electrical distribution-board component of the project. They do not show the rooftop air-conditioning units, which formed a separate part of the same scope.
Existing electrical distribution board before office park upgrade
BEFORE

EXISTING DISTRIBUTION EQUIPMENT

The original board contained older distribution equipment and formed part of the electrical infrastructure identified for upgrading as part of the wider building-services project.

Electrical distribution board after office park upgrade
AFTER

RECONFIGURED ELECTRICAL DISTRIBUTION

The completed board reflects the electrical upgrade component of the project, including replacement and reorganisation of distribution equipment and associated cabling.

WHAT THE PROJECT INVOLVED

HVAC AND ELECTRICAL WORK DELIVERED AS ONE UPGRADE

ROOFTOP AIR-CONDITIONING UNITS

Four older rooftop units were replaced as part of the air-conditioning upgrade.

HIGH-EFFICIENCY REPLACEMENTS

The replacement units were selected as higher-efficiency equipment to address the ageing systems and energy-use concern.

DISTRIBUTION-BOARD UPGRADES

Electrical distribution boards formed part of the upgrade scope rather than leaving the older distribution infrastructure unchanged.

BREAKERS & CABLING

Breakers and associated cabling were upgraded as part of the electrical works supporting the revised installation.

LOAD BALANCING

Load distribution formed part of the electrical upgrade with the objective of improving the operation of the revised system.

COORDINATED BUILDING-SERVICES UPGRADE

Air-conditioning and electrical requirements were handled as a coordinated project because changes to mechanical plant can affect the electrical infrastructure supporting it.

THE RESULT

AIR-CONDITIONING AND ELECTRICAL SYSTEMS UPGRADED OVER 12 DAYS

Four rooftop air-conditioning units were replaced and the associated electrical distribution infrastructure was upgraded.

WHAT THE UPGRADE WAS INTENDED TO ACHIEVE

The purpose of the project was to move the office park away from repeated breakdowns associated with ageing equipment and toward a more appropriate building-services configuration.

Replacing the rooftop air-conditioning units addressed the ageing mechanical equipment, while the distribution-board, breaker and cabling work addressed the electrical infrastructure supporting the upgraded systems.

The project record also identifies improved load balancing and energy efficiency as outcomes of the upgrade.

PLANNING A BUILDING-SERVICES UPGRADE?

THE QUESTIONS TO ANSWER BEFORE REPLACING EQUIPMENT

REPAIR AGAIN OR REPLACE?

Repeated faults, equipment age, parts availability and operating cost should all be considered when deciding whether continued repair remains commercially sensible.

WHAT ELECTRICAL CAPACITY IS AVAILABLE?

Replacement mechanical equipment should be considered alongside the electrical supply, protection and distribution infrastructure that will support it.

DOES THE DB ALSO NEED UPGRADING?

Existing distribution boards, breakers and cabling should be assessed when larger HVAC or electrical equipment changes are planned.

HOW WILL DOWNTIME BE MANAGED?

Office parks and occupied buildings may need phased shutdowns, temporary arrangements or carefully planned work windows to minimise operational disruption.

HOW IS ENERGY USE BEING ASSESSED?

Equipment selection should consider required capacity, operating demand and expected use rather than relying only on the nominal size of the old installation.

WHICH TRADES NEED TO WORK TOGETHER?

HVAC replacement can involve mechanical, electrical, controls, lifting, roofing and other site requirements depending on the equipment and installation.

HOW WE APPROACH TECHNICAL UPGRADES

FROM EXISTING SYSTEM TO COORDINATED REPLACEMENT

01
ASSESS

Review existing equipment, faults and infrastructure.

02
DEFINE

Establish replacement, electrical and access requirements.

03
PLAN

Coordinate equipment, shutdowns and trade sequencing.

04
UPGRADE

Complete the mechanical and electrical work.

05
COMPLETE

Review the installation and close out the agreed scope.

WHAT AFFECTS TECHNICAL-UPGRADE COST?

  • number and capacity of existing HVAC units;
  • condition of existing equipment;
  • electrical supply and DB condition;
  • breaker and cabling requirements;
  • equipment access and lifting requirements;
  • controls and system interfaces;
  • occupied-building shutdown requirements;
  • programme and phasing.

WHAT TO SEND US

  • site address;
  • equipment make and model where available;
  • photographs of existing units;
  • description of current faults or concerns;
  • DB and electrical information where available;
  • operating-hour restrictions;
  • access or rooftop constraints;
  • required project timing.

PLANNING AN AIR-CONDITIONING OR ELECTRICAL UPGRADE?

Send the site address, equipment details, photographs and information about the current faults or operating concerns. We will assess the appropriate next step.